Rebuild of the Wanganui WWTP

Wanganui WWTP, apart from a few buildings and some re-usable equipment it is to being totally rebuilt. The Head Contractor is Hawkins and we are working with our parent company Service Engineers to provide a complete solution. The project is well underway with construction due to be complete early this 2018

While the consultants have designed the process and provided a specification, Generic Drawings, SLD's and schedules, the Project is for the Detailed Design and Build.

There is the standard waste water plant equipment that is installed in Gas Hazardous areas. Due to the additional sludge drying process, a explosive dust will be introduced that also needs to have the correctly rated equipment selected and installed.